3" Air Intake Elbow Tube For 98.5-02 Dodge Ram 2500 3500 Cummins Diesel 5.9L

Out of stock
SKU
SSN020006
  • Free Shipping - 48 US States(SHIPS FROM US)
Quick Overview
  • High Quality Material
  • High Horsepower and Torque
  • Direct Fitment; No Modifications Required
  • High-quality sealing ring to prevent oil leakage
  • Quality tested for trouble-free performance
Special Price $38.99 Regular Price $50.69

Wholesale Deals: CLICK TO GET 5%-25% OFF!

  • First Order CODE:NEW10copy

Description

  • 100% brand new, Never been tried or installed
  • This kit is designed and engineered to outperform the competition.
  • Comes with a mandrel bent aluminum tube and CNC base plate.
  • This intake elbow has 4 1/8 NPT fitting for a boost gauge.
  • Construction: Aluminum
  • Product Design: Mandrel bent tubing with full TIG welds and pressure tested
  • Note: This intake elbow has 4 1/8 NPT fitting for a boost gauge
  • Professional installation in highly recommended(No instruction included)

 

Fitment 

  • For 1998.5-2002 Dodge Ram 5.9L Cummins Diesel

 

Package Includes

  • 1X Intake Elbow
  • 4X 1/8 NPT Fitting
  • 1X Gasket
  • As pictures show above

⚠️WARNING: This product can expose you to chemical which is known to the State of California to cause cancer and birth defects or other reproductive harm. For more information go to www.P65Warnings.ca.gov.

VEHICLE NAMEYearEngine
Dodge Ram 25001998~20025.9L
Dodge Ram 35001998~20025.9L
Write Your Own Review
You're reviewing:3" Air Intake Elbow Tube For 98.5-02 Dodge Ram 2500 3500 Cummins Diesel 5.9L
Your Rating

Shipping Policy

Please confirm the shipping address and billing address. The shipping address should be a physical address, we DO NOT ship to the P.O. box address.

Handling Time

Once the order was placed please allow us 1-2 business days for packing and shipping, checking the order information is a very important step to build a better shopping experience.
Special Case: For the transaction paid by using a PayPal eCheck, the payment will be completed within 3-6 business days. The handing and shipping should be started up as soon as the payment is successful.